07-26-2022
Assembled Research | Magnet Formwork The prefabricated concrete magnet formwork is composed of formwork steel bar and embedded magnetic suction cup system. The steel formwork can be made into various sizes to apply to the side formwork of different concrete components. Through the tension of the suc Read More
11-08-2022
SX-2100kg , Size : 320x120x60mm , N.W. 7.6kg , suitable for solid wallboards with thickness of more than 100mm , Through reasonable design of magnetic circuit and improvement of magnet grade, we have designed SX-2600 magnet box with a suction of more than 2600kg,which can meet the formwork fixing re Read More
10-28-2022
1. Analyze the design costs of the prefabricated building Nowadays, the design of prefabricated buildings mainly adopts the design method equivalent to cast-in-place, and then the components are separated according to the assembly and production requirements of a component. This method has low de Read More
05-24-2022
Prefabricated building means that the building’s main components are assembled in a factory, transported to the site and then assembled as a whole. Therefore, this kind of structure has a high degree of industrial production, high construction speed, can effectively ensure the quality of components, Read More
05-12-2022
With the vigorous development of domestic prefabricated buildings, more and more PC component manufacturers begin to use magnetic fixation, but the quality of magnetic fixation products in the market is uneven, and there is no quality standard for magnetic fixation products used in PC components in Read More
03-25-2022
The production and application of prefabricated parts in China has a history of nearly 60 years. In these 60 years, the development of prefabricated parts can be described as striking one snag after another . Since the 1950s, China has been in the period of economic recovery and the first Five-Year Read More